top of page

By integrating our latest mining boilers with a smart control system, we offer a solution that not only provides hashrate with thermal efficiency exceeding 95%, but also functions as a heating system. Our solution is adaptable to various heating applications, including residential homes, greenhouses, fish farms, and commercial buildings. In addition, if heating is not required, we can provide direct heat dissipation solutions.

Using the heat generated by the chips from our mining boilers, our energy solution can be applied into various heating scenarios, such as flare gas, biogas, landfill gas, photovoltaics, and seawater desalination. Combined with heating applications, we achieve "double zero mining," which means "zero electricity fee mining and zero carbon emission mining."

画板 1 副本 6_3x 2.png
Enter a New Era of Zero Carbon Emission Mining
Business scope
  • Product design

  • Product manufacturing

  • Customized product

  • Project planning

  • Project commissioning

  • Project operation

环境图.png

Milestones

200 MW

  • We will keep on pursuing technological innovation, unceasingly strengthen our core competitive edge, and render more significant contributions to the advancement of the industry.

100 MW

  • Multiple large-scale applications:  Pennsylvania  integrated heating, Houston  hydroelectric power station, Abu Dhabi 46℃ high temperature 1MW hydro-cooled site, American flare  gas, Canadian greenhouse,  German/Swiss/British residential heating.

  • CE and CSA certification

  • The H, M, N rack and X series container have been successfully deployed in Europe, the Middle East, and North America.

  • The 2.1 MW flare gas project in the Middle East showcases the company's technology, proving its reliability and efficiency in high-temperature environments (47 °C)

  • Whatsminer’s new M34 mining system operates successfully in small-scale operations.

  • First application of waste heat from mining for residential heating.

  • H, N series hydro cooling cabinets have been successfully tested and put into operation.

  • The city heating system has been put into operation smoothly.

  • Large-scale application: 40 MW system

  • Entered the water cooling field  

  • Developed the first M21S water cooling cabinet  in cooperation with MicroBT and successfully put into operation

                                      Ongoing Updates

iconmonstr-magnifier-lined-240 (1).png

Vision
Empower people's livelihood ,Create zero carbon

iconmonstr-task-list-square-lined-240.png

Mission
Environment friendly,Social friendly,Grid friendly

iconmonstr-idea-2-240.png

Values
Focus on technological innovation, and lead the development of the industry

Team and location

Our team consists of multiple disciplines, aiming to provide our clients with the most comprehensive solutions.

image.png

Our business spans the globe with headquarters in Texas, USA. Our products are developed in Chengdu, China, and we also have a branch in Canada.

Authority

Backed by CV

bottom of page